Aiways U5 charging
Shown: Aiways U5 Prime (MY2022)
10-80% fast charge
The Aiways U5 charges 10-80% in 34 minutes on a DC fast charger. A test measured 34 minutes. It peaks at 90 kW on DC.
Does it really charge that fast?
10-80% fast charge
The test matches the claimed time.
Is that fast?
Published at 34 min, the Aiways U5 is slower than the median of 28 min among 207 EVs with a published time.
Aiways U5 · claimed 34 min · #163 of 207
- Smart #130 min claimed
- Neta U30 min claimed
- Aiways U634 min claimed
- Aiways U534 min claimed
What does it cost to charge?
Set your electricity price and miles. The consumption comes from this car; the rest are your assumptions.
Difference per year
$631 a year cheaper than gas
estimateRests on a figure that is collected, not yet verified.at 600 mi/month, home $0.17/kWh, gas $4.16/gal, 31 mpg
Your assumptions
This car's data (fixed)
Illustrative starting values, not a quote (as of Jun 2026): home $0.17/kWh, public DC $0.45/kWh, gas car $4.16/gal, 31 mpg. Charging losses are not included.
Which plug, and what can it power?
- DC peak power
- 90 kW
- The top speed on a DC fast charger; it is not a charging time.
- Battery voltage
- 400 V
- Nominal battery voltage, as the source lists it.
- Onboard AC charger
- 11 kW
- Sets the top speed on a home or destination charger.
Where do these numbers come from?
| Figure | Value | Source | Checked |
|---|---|---|---|
| 10-80% claimedautomobile-propre.com | 34 minSep 18, 2026 | automobile-propre.com | Sep 18, 2026 |
| 10-80% testedautomobile-propre.com | 34 minSep 18, 2026 | automobile-propre.com | Sep 18, 2026 |
| DC peak poweraiways.dk | 90 kWSep 17, 2026 | aiways.dk | Sep 17, 2026 |
| DC peak testedautomobile-propre.com | 92 kWSep 18, 2026 | automobile-propre.com | Sep 18, 2026 |
| Onboard AC chargerai-ways.fr | 11 kWSep 17, 2026 | ai-ways.fr | Sep 17, 2026 |
| Battery voltageadac.de | 400 VSep 18, 2026 | adac.de | Sep 18, 2026 |