Alpine A290 charging
Shown: GT +
The Alpine A290's 10-80% fast-charge time is not published. A test measured 31 minutes. It peaks at 100 kW on DC. On AC it takes up to 11 kW.
Does it really charge that fast?
How many miles in a 10-minute stop?
Estimates from the 31 min test and the 236 mi WLTP range, spread evenly over the stop.
Energy added and average power: not enough data to estimate - only the gross 52 kWh battery is published.
Is that fast?
Tested at 31 min, the Alpine A290 is slower than the median of 28 min among 207 EVs with a published time.
Alpine A290 · tested 31 min · #153 of 207
What does it cost to charge?
Set your electricity price and miles. The consumption comes from this car; the rest are your assumptions.
Difference per year
$655 a year cheaper than gas
estimateRests on a figure that is collected, not yet verified.at 600 mi/month, home $0.17/kWh, gas $4.16/gal, 31 mpg
Your assumptions
This car's data (fixed)
Illustrative starting values, not a quote (as of Jun 2026): home $0.17/kWh, public DC $0.45/kWh, gas car $4.16/gal, 31 mpg. Charging losses are not included.
Which plug, and what can it power?
- DC peak power
- 100 kW
- The top speed on a DC fast charger; it is not a charging time.
- Battery voltage
- 400 V
- Nominal battery voltage, as the source lists it.
- Onboard AC charger
- 11 kW
- Sets the top speed on a home or destination charger.
- Power out to devices (V2L)
- 3.7 kW
- Powers devices and tools from the car.
- Heat pump
- standard
- Heats the cabin with less of the battery in winter.
Where do these numbers come from?
| Figure | Value | Source | Checked |
|---|---|---|---|
| 10-80% claimed | Not searched yet | ||
| 10-80% testedassets.adac.de | 31 minNov 5, 2026 | assets.adac.de | Nov 5, 2026 |
| DC peak poweralpine-cars.co.uk | 100 kWOct 21, 2026 | alpine-cars.co.uk | Oct 21, 2026 |
| DC peak testedassets.adac.de | 101 kWNov 5, 2026 | assets.adac.de | Nov 5, 2026 |
| Onboard AC chargeralpine-cars.co.uk | 11 kWOct 21, 2026 | alpine-cars.co.uk | Oct 21, 2026 |
| Battery voltageadac.de | 400 VNov 5, 2026 | adac.de | Nov 5, 2026 |
| Power out (V2L)assets.adac.de | 3.7 kWNov 5, 2026 | assets.adac.de | Nov 5, 2026 |
| DC charge 15–80 % — not a 10–80% figurealpine-cars.co.uk | 30 minOct 21, 2026 | alpine-cars.co.uk | Oct 21, 2026 |
Miles per stop are our estimates from these figures.
All 9 sources of the Alpine A290